成人中文字幕在线视频,苦恋电影免费完整版在线观看,色戒末删除完整版在线观看,强制入侵完整版在线观看,电视剧都挺好在线观看,亚洲最大成人免费网站,在线日韩在线

2 tunnels dug through in China-Laos Railway construction

Source: Xinhua| 2019-04-15 19:28:29|Editor: zh
Video PlayerClose

LAOS-OUDOMXAY-CHINA-LAOS RAILWAY-TUNNEL CONSTRUCTION

A staff member of China Railway No. 5 Engineering Group stands at the entrance to Nathong No. 2 Tunnel of China-Laos Railway after the tunnel was dug through in Oudomxay Province of Laos, some 400 km north of Lao capital Vientiane, April 15, 2019. Two tunnels of the China-Laos Railway, namely Nathong No. 2 and Nateuy No. 2, were dug through on the same day on Monday by the constructor China Railway No. 5 Engineering Group. (Xinhua/Hu Yong)

   Prev 1 2  

KEY WORDS:
YOU MAY LIKE
EXPLORE XINHUANET
010020070750000000000000011100001379790851